Quality system stories

Case Studies for ISO 13485 - GMP - QMSR

Walk through real ISO 13485, QMSR and IEC 62304 projects delivered by I3CGlobal, slide by slide. Select a project to see how it was delivered.

5Case studies
2022–25Project years
Case study 01 of 05

QMSR – Dental Devices

Scope: Design, Development, Manufacturing, and Distribution of Dental Devices

⛶ Full screen

Click the slide and use the ‹ › arrows to go through each slide.

Standard
21 CFR 820 (QMSR)
Device Type
Non-Sterile
Project Tenure
May 2024 – Mar 2025
Case study 02 of 05

ISO 13485 – Sterile Devices

Scope: Design, Development, Manufacturing, Testing and Distribution

⛶ Full screen

Click the slide and use the ‹ › arrows to go through each slide.

Standard
ISO 13485
Device Type
Sterile
Project Tenure
Sep 2022 – Mar 2023
Case study 03 of 05

IEC 62304 – Software Device

Scope: Design, Development, Manufacturing, Testing, Integration and Distribution

⛶ Full screen

Click the slide and use the ‹ › arrows to go through each slide.

Standard
IEC 62304
Device Type
Software Device
Project Tenure
Oct 2024 – Jul 2025
Case study 04 of 05

ISO 13485 + IEC 62304 – Software Device

Scope: Design, Development, Manufacturing, Testing and Distribution

⛶ Full screen

Click the slide and use the ‹ › arrows to go through each slide.

Standard
EN ISO 13485 + IEC 62304
Device Type
Software Device
Project Tenure
Mar 2024 – Feb 2025
Case study 05 of 05

ISO 13485 + IEC 62304 – Blood Glucose Monitoring System

Scope: Design, Development, Manufacturing, Testing and Distribution of Blood Glucose Monitoring System and Accessories

⛶ Full screen

Click the slide and use the ‹ › arrows to go through each slide.

Standard
EN ISO 13485 + IEC 62304
Device Type
Hardware + Firmware
Project Tenure
Mar 2023 – Apr 2024

Planning ISO 13485 or QMSR certification?

Talk to our quality team about your scope, devices and timeline.

Request for Proposal